17.05.2026
transport
17:59
Информација о промени режима рада линија јавног превоза током извођења радова на изградњи тунелске везе од улице Карађорђева до Дунавске падине – Фаза 1
Information on the change in the operating mode of public transport lines during the construction of the tunnel connection from Karađorđeva Street to Dunavska padina - Phase 1 33 48 58 96 21/04/2026 - 10/02/2027 The Secretariat for Public Transport informs the public that starting from Tuesday, 21.04.2026. preparatory works on the construction of the part of the tunnel connection from Karađorđeva Street to Dunavska padina - Phase 1. During the mentioned phase of the works, which includes Jovana Avakumovića Street (part from Bulevar Despota Stefana in a length of 110 meters towards Poenkareova Street) and Bulevar Despota Stefana (a part from Dragoslav Srejovića Street in a length of 450 meters to Kralja Dragutina Street), the following are planned occupations and changes: complete closure of Jovana Avakumović Street for traffic on the observed section, closure of the right traffic (yellow) lane of Bulevar Despot Stefana Street from Dragoslav Srejović Street to ul. Kralja Dragutin, seen in the direction of the city center, while the paved traffic lane becomes a lane exclusively for public transport vehicles. The mentioned works will lead to changes in the mode of operation of the public transport lines, which will move as follows: Lines no. . 33 and 48 - in the direction of Kumodraž and Miljakovac, from the terminus "Railway Station (Pančevački bridge)" streets: Poenkareova to the roundabout in the intersection with Jovana Avakumovića street, where they will change the direction of movement, Poenkareova towards Pancevački bridge, M-1.9 (connection between Poenkareova Street and Bulevar despota Stefana), Bulevar despota Stefana, Metropolitan Petra and beyond regular routes; - in the direction of the terminus "Railway Station (Pančevački bridge)", streets: Bulevar despota Stefana, Cvijićeva, Poenkareova to the terminus itself; Line no. 58 - in the direction of Železnik, from the terminus "Railway Station (Pančevački Bridge)" through the streets: Poenkareova Cvijićeva, Bulevar despota Stefana and further along the regular route; - in the direction of the "Railway Station (Pančevački Bridge)" terminus, it will move on its regular route; Line no. 96 - in the direction of Borča, from the terminus "Railway Station (Pančevački bridge)" streets: Poenkareova to the roundabout in the intersection with Jovana Avakumovića street, where they will change the direction of movement, Poenkareova towards Pancevački bridge, M-1.9 (connection between Poenkareova street and Bulevar despot Stefana), Bulevar despota Stefana and further along the regular route; - in the direction of the terminus "Railway Station (Pančevački Bridge)", streets: Bulevar despota Stefana, Cvijićeva, Poenkareova to the terminus itself. During the execution of the works in this phase, the "Jovan Avakumovića" stop in Bulevar despota Stefana street (in front of the MUP building) will be temporarily canceled - in the direction of the city, while vehicles from line no. . 33, 48 and 96 in the direction of the city temporarily use the stop "Railway station (Danube)" (#709), which is regularly used by line no. 44 as its starting point. Work zone Select line 33 [Pančevački most railway station - Kumodraž] 48 [Pančevački most railway station - Miljakovac 3] 58 [Pančevački most railway station - Novi Železnik] 96 [Pančevački most railway station - Borča 3]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the reconstruction of the bridge structure in the street of Antifascistke Borbe
Information about the change in the operating mode of public transport lines during the works on the reconstruction of the bridge structure in the street Antifašistke Borbe 9L 9A 60 94 95 E6 A1 7L 7A 7 9 13 7l 9l 2L1 7L2 9L2 11A 85 15/01/2026 - 15/06/2026 The works have been extended until 15.06.2026. year. During the execution of works on the construction of the New Belgrade station complex with the reconstruction of the bridge structure in Antifašističke street in the period from January 15, 2026. until 08.03.2026. there will be changes in the operation of public transport lines. The works are being carried out on the roadway of Antifašističke Borbe street at the level of the railway overpass, during which the subject section will be closed to traffic, which is why the public transport lines will operate as follows: Tram lines no. 7L, 9L and 13 are temporarily suspended; Temporarily us installs tram line 7L1, which will operate on the route Ustanička - Pogon "Sava" via the Ada Bridge; Tram line 9L1 is being temporarily established, which will operate on the route Banjica - Pogon "Sava" via the Ada Bridge; A circular bus line no. is being temporarily established. 7A, which will run from Blok 45 through the following streets: terminus "Blok 45", Dr. Ivan Ribar, Jurij Gagarin, Crvena Armija Boulevard, Đorđe Stanojevića, Milutin Milankovića, Milentije Popovića Boulevard, Mihajla Pupina Boulevard, roundabout at TC "Ušće", Mihajla Pupina, Milentije Popovića Boulevard, Milutin Milankovića, Đorđe Stanojevića Boulevard, Bulevar Crvene Armije, Jurija Gagarin, Dr. Ivan Ribara to terminus "Blok 45"; Vehicles from line 9A will travel in both directions on the streets: Jurij Gagarin, Marko Hristić, Đorđe Stanojevića, Bulevar Milutin Milankovića, Milentije Popovića and further in line with the works in Zemunski put Street; Vehicles from line 94 will travel in both directions on the streets: Jurij Gagarin, Marko Hristić, Đorđe Stanojević, Bulevar Milutin Milankovića, Omladinskih brigada and further along the regular route; Vehicles from line 95 will travel in both directions on the streets: Jurija Gagarin, Milutin Milankovića Boulevard, Milentije Popovića and further along the regular route; Vehicles from line 60 will travel in the direction of the terminus "Novi Beograd /Toplana/", on the streets: Brodarska, Savski Nasip, Jurija Gagarina, then in the area of the intersection of Jurija Gagarin Street and Bulevar Milutin Milankovića, they will make a left turn towards Block 45, Jurija Gagarina and continue regularly to the turnpike Novi Beograd /Toplana/"; Vehicles from line A1, in the direction of Trg Slavija, will drive walk through the streets of: Španski borac, Đorđe Stanojević, Marko Hristić, Jurij Gagarin and further along the regular route; Vehicles from the E6 line will travel in both directions on the streets: Jurij Gagarin, Marko Hristić, Đorđe Stanojević, Milutin Milankovića Boulevard and on the regular route. Vehicles will use all existing stops, as well as the newly established temporary stops: - "Bulevar Crvene Armije 1" on Bulevar Crvene Armije Street at a location located about 90 meters after the intersection zone of Bulevar Crvene Armije Street and Yuri Gagarin Street, i.e. at the height of the "Delta City" building. The stop in question will be used by line no. 7A; - "Depo Sava" in Đorđe Stanojevića Street at a location that is located about 30 meters in front of the intersection of Đorđe Stanojevića and Marko Hristića Streets, i.e. at the height of the "Depo Sava" plant. The stop in question will use lines no. 7A, 85 and 18N; - "Đorđa Stanojevića 1" in Đorđa Stanojevića Street at a location located about 60 meters in front of the intersection of Đorđa Stanojevića Street and Milutin Milankovića Boulevard. The stop in question will use lines no. 7A, 9A and 18N; - "Pogon Sava" in Đorđa Stanojevića Street, at a location that is located about 10 meters before the turn to the "Sava" tramway. The stop in question will use lines no. 7L1 and 9L1; - "Pogon Sava" in Đorđe Stanojevića Street, at a location located about 40 meters after the exit from the "Sava" tramway. The stop in question will use lines no. 7L1 and 9L1. In the time intervals from 22:00 to 04:00, the following mode of operation of the public transport lines will apply: Tram line no. 2L runs on the existing t drive to Gospodarska mehana (around 10:00 p.m.), when the 2L1 (Pristanište - Trg Slavija - Pristanište) traffic starts on the circular route: PRISTANIŠTE, Pariska, Pieron de Mondezire, Tsar Dušan, George Washington, March 27, Professor Mihailo Đurić, Beogradska, SLAVIJA SQUARE, Nemanjina, Resavska, Bulevar Kralja Aleksandar, Rooseveltova, Kraljice Marie, March 27, George Washington, Tsar Dushan, Pierron de Mondezir, Paris, PORT; Tram lines no. 7 L1 and 9L1 operate on the existing routes until the tramway (around 10:00 p.m.), when under the signs 7L2 (Ustanička - Gospodarska mehana) and 9L2 (Banjica - Gospodarska mehana) they begin to operate from the terminus "Ustanička" and "Banjica" to the terminus "Gospodarska mehana"; Tram line no. is still not running. 13; From around 10:00 p.m., cf the temporary circular bus route 11A (Naselje Belvil - Belgrade na Vodi - Naselje Belvil) is left, which will operate on the route NESLJE BELVIL, Đorđe Stanojevića, Red Army Boulevard, Yuri Gagarin, Most na Ada, Vojvode Mišić Boulevard, King Aleksandar I Karađorđević (Savska) Boulevard, Nikolaj Kravcov, Woodrow Wilson Boulevard, Vojvode Mišić Boulevard, Most na Adi, Jurija Gagarin, Marko Hristić, Đorđe Stanojević, NESLJE BELVIL; In the time intervals from 22:00 to 24:00, tram line no. 5, 6, 8, 10, 12 and 14 will not work, but the vehicles will go to the depot after the last runs. Work zone Select line E6 [Mirijevo 4 - Novi Beograd /Block 45/] A1 [Slavija Square - Nikola Tesla Airport] 2L1 [Pristanište - Slavija Square - Pristanište] 7L [Ustanička - Pogon "Sava"] 7A [Block 45 - TC "Ušće" - Block 45] 7L2 [Ustanička - Gospodarska mehana] 7l [Ustanička - Block 45] 9L2 [Banjica - Gospodarska mahana] 9l [Banjica - Block 45] 9L [Banjica - Pogon "Sava"] 9A [Block 72 /TC Eurasia/ - Trg Slavija - Block 72 /TC Eurasia/] 11A [Nesselje Belleville - Belgrade on the Water - Naselje Belvil] 60 [Zeleni Venac - Museum of Contemporary Art - New Belgrade /Toplana/] 85 [Banovo Brdo - Borča 3] 94 [Novi Belgrade /Blok 45/ - Resnik /Edvarda Griga/] 95 [Novi Belgrade /Blok 45/ - Borča 3]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the performance of works in Dragoslava Srejovića Street - Phase 3
Information about the change in the operating mode of public transport lines during the performance of works in Dragoslava Srejovića Street - Phase 3 27 27E 27L 27N E6 19/05/2026 - 24/05/2026 During the performance of regular maintenance works in Dragoslava Srejovića Street in the section between the intersection zone with Pera Ćetkovića Street and the intersection zone with Jovanka Radaković Street in the period from 19 05. 2026 to 24 05. 202 6. there will be changes in the operation of public transport lines. The works involve the closure of the full profile of Dragoslav Srejovića Street on the observed section for the period of 18 05. 2026 to 24 05. 202 6. year, which is why public transport vehicles will operate as follows: - line no. 27 in the direction of Mirijevo along the streets of Mija Kovačevića, the roundabout near the Bogoslovija, Bulevar despota Stefana, Višnjička, Vojvoda Micka Krstić, Marijana Gregoran, Salvador Allende, Mirijevski boulevard, Vitezova Karađorđeve zvezda, Mirijevski venac and still a regular route; in the direction of the city, the streets Mirijevski venac, Vitezova Karađorđeve zvezda, Mirijevski boulevard, Salvador Allende, Marijana Gregoran, Dragoslav Srejović and further along the regular route; - line no. 27N in the direction of Mirijevo along Severni boulevard, the roundabout near the seminary, Despota Stefan, Višnjička, Vojvoda Mick Krstić, Marijana Gregoran, Salvador Allende, Mirijevski boulevard, Vitezova Karađorđeve zvezda, Mirijevski venac and further along the regular route; in the direction of the city, the streets Mirijevski venac, Vitezova Karađorđeve zvezda, Mirijevski boulevard, Salvador Allende, Marijana Gregoran, Dragoslav Srejović and further along the regular route; - line no. 27E and E6 in the direction of Mirijevo along the streets Bulevar despota Stefan, Dragoslav Srejović, Mija Kovačević, Višnjička, Vojvoda Micka Krstić, Marijana Gregoran, Salvador Allende, Mirijevski boulevard, Vitezova Karađorđeve zvezda, Mirijevski venac and further on regular routes; in the direction of the city, streets Mirijevski venac, Vitezova Karađorđeve zvezda, Mirijevski boulevard, Salvador Allende, Marijana Gregoran, Dragoslav Srejović are still regular and m routes; - a temporary minibus line no. 27L (Youth Stadium - Mirijevo), which will run on the route: in the direction of Mirijevo - YOUTH STADIUM, Dragoslav Srejović, roundabout near Bogoslovija, Dragoslav Srejović, Pera Ćetković, Garci Lorka, Laza Stefanović, Jovanka Radaković, Vitezova Karađorđev zvezda, Mirijevski venac, MIRIJEVO; in the direction of the city in - MIRIJEVO, Vitezova Karađorđev zvezda, Mirijevski venac, Knights of Karađorđev zvezda, Jovanke Radaković, Ladne vode, Mirijevski boulevard, Pere Ćetkovića, Dragoslav Srejovića, roundabout near the Bogoslovija, Dragoslav Srejovića, YOUTH STADIUM; Vehicles will use the newly established temporary stops on the changed part of the route: "Youth Stadium 1" (code st. # 3605 - direction Mirijevo) in Mije Kovačevića Street at the position of the ED pillar located about 70 meters after the roundabout near the Seminary for lines no. 27E and E6; "Salvadora Allendea 1" (code st.# 4118 - direction to the city) in Salvador Allendea Street at the position in front of TC "Karaburma" for lines no. 27, 27E, 27N and E6; "Crkva 1" (code st.# 4132 - direction to Mirijevski boulevard street) in Vitezova Karađorđeve zvezde street at the position of the ED pillar which located in front of house number 28, i.e. 35.0 meters after the pedestrian crossing located after the intersection zone with Danilova Street; "Crkva 1" (code st.# 4131 - direction towards Jovanke Radaković Street) in Vitezova Karađorđeve Zvezde Street opposite house number 28 (at the height of the Church building), i.e. about 58.0 meters after the pedestrian crossing located after the intersection zone with Mirijevski Bulevar Street; "Dragoslav Srejovića 1" (code st.# 4169 - direction towards Dragoslava Srejovića street) in Marijane Gregoran street, at the position of the ED pillar about 20.0 meters in front of the marked pedestrian crossing in the area of the intersection of Dragoslava Srejovića and Marijana Gregoran streets; "Pera Slijepčevića 1" - (code st.# 4170 - direction Mirijevo) in Pera Ćetkovića street, at the position of the ED pillar which is located directly in front of the intersection zone with Pera Slijepčevića Street, for line no. 27L; "Ćalije 1" - (code st.# 4171 - direction Mirijevo) in Jovanke Radaković Street, at the position of the ED pillar located immediately 32 meters after the intersection zone with Laza Stefanovića Street, for line no. 27L; "Ladne vode 1" - (code st.# 4172 - direction towards the city) in Ladne vode street, at a position about 20 meters after the marked pedestrian crossing in the area of the intersection of Jovanka Radaković and Ladne vode streets, for line no. 27L; "Pera Ćetkovića 1" - (code st.# 4173 - direction towards the city) in Dragoslava Srejovića street, at a position 30 meters after the intersection zone with Pera Ćetkovića street, for line no. 27L. Work zone Select line E6 [Mirijevo 4 - Novi Beograd /Blok 45/] 27 [Trg Republike - Mirijevo 3] 27E [Novi Beograd (Blok 20) - Mirijevo 4] 27L [Youth center ion - Mirijevo] 27N [Trg Republike - Mirijevo 3]
Beograd
Source
24.05.2026
transport
19:16
Zvezdara
Information about the change in the mode of operation of public transport lines during the execution of works in Gospodara Vučića Street - Phase 1
Information on the change in the mode of operation of public transport lines during the performance of works in Gospodara Vučića Street - Phase 1 46 55 18/05/2026 - 18/06/2026 During the performance of regular maintenance works in Gospodara Vučića Street in the section from the intersection zone with Križanićeva Street to the intersection zone with Vojislav Ilića Street in the period from 18.5. until 18 6.2026. there will be changes in the operation of public transport lines. The works are being carried out on the roadway and on the sidewalk, which will result in the closure of the left traffic lane (as seen in the direction of Vojislava Ilića Street), which is why public transport lines will run as follows: Vehicles from line no. 46 in the direction of Mirijevo will run through the streets: Gospodar Vučić, Vojislav Ilić, Ustanička, Bulevar Kralja Aleksandra, Mita Ružić and further along the regular route, while will drive in the opposite direction on a regular route; Vehicles from line no. 55 will travel in the direction of Zvezdara through the streets: Gospodar Vučić, Vojislav Ilić, Ustanička, Bulevar Kralja Aleksandar, Vjekoslav Kovač until the "Zvezdara /pijaca/" turnpike, while in the opposite direction it will travel from the "Zvezdara /pijaca/" turnpike through the streets Vjekoslav Kovača, Deskaševa, Bulevar Kralja Aleksandar, Gospodar Vučić and continue on the regular route. use all existing JLPP stops on the modified part of the route. Work zone Select line 46 [Belgrade na vodi - Mirijevo] 55 [Zvezdara - Stari Železnik]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about works in Vojvođanska Street – Phase 1
Information about works in Vojvođanska Street – Phase 1 72 72 601 603 605 610 72N 601N 603N 604 #1760 #1761 20/05/2026 - 02/06/2026 During the execution of Phase 1 of works on asphalting and landscaping of Vojvođanska Street (GO Surčin), on part of the street Belgrade Airport to Hajduk Veljkova Street, in the period from 20.05. until 02. 06.20 26. there will be changes in the functioning of public transport. The works involve the occupation of the far left traffic lane (seen in the direction of the city) and the sidewalk on the section in question, whereby JLPP vehicles in the work zone will move on the free width of the roadway with alternating passing regulated by temporary traffic lights and traffic signs. During the execution of the works in this phase, the bus stops are temporarily moved, namely: - "Vikend naselje" (direction to Surčin) - the bus stop is from moves to a position located about 22 meters after the intersection zone with Mome Kapora Street, that is, about 70 meters in front (backward) of the regular position; - "Weekend naselje" (direction towards the city) - the stop is moved to a position that is located about 30 meters after the intersection zone with Moma Kapora street, that is, about 70 meters after the (in advance) regular position. Work zone Temporary relocated stop Select line 72 [Zeleni Venac - Nikola Tesla Airport] 72 [Zeleni Venac - Nikola Tesla Airport] 72N [Trg republike - Nikola Tesla Airport] 601 [Belgrade na vodi - Surčin] 601N [Slavija Square - Surčin] 603 [Bežanija/Ledine/ - Ugrinovci] 603N [Studentski trg - Dobanovci - Ugrinovci] 605 [Novi Beograd /Blok 45/ - Progar] 610 [Zemun /Kej Oslobođenja/ - Jakovo]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the execution of works in Crnotravska Street
Information about the change in the operating mode of public transport lines during the execution of works in Crnotravska Street 40L 40 42 49 59 78 80 94 41A 47N 40 42 49 59 78 80 94 41A 47N #285 #286 28/05/2026 - 05/08/2026 During the execution of reconstruction works of the hot water distribution network in Crnotravska Street, there will be changes in the operation of public transport lines. The works will be carried out in phases, namely: Phase 2 - the works follow up on the existing works and are carried out for the next 80 meters in the direction of the city in a period of 27 . 0 5 . until 07 0 6.202 6. year. During the execution of the works, the right side of the sidewalk (seen in the direction of the city) will be occupied, and these works will not affect the functioning of the JLPP; Phase 3 - the works are a continuation of the works from phase 2, the next 150 meters seen in the direction of the city in the period of 08 . 06. to 27. 06.202 6. year. During the execution of the works, the right lane will be occupied (looking towards the city), whereby JLPP vehicles in the work zone will move on the remaining width of the roadway, which will be two-way for traffic. During the execution of the works, the "Military Medical Academy" bus stop is temporarily moved, namely: direction towards the city, it is moved to a location located about 55 meters after the regular position; the direction towards Banjica, is moved to a location that is located about 195 meters in front of the regular position; Phase 4 - the works are a continuation of the works from phase 3, the next 200 meters seen in the direction of the city in a period of 28. 06. to 22. 07.202 6. year. During the execution of the works, the right lane will be occupied (as viewed in the direction of the city), whereby JLPP vehicles will move in the work zone in the remaining about the width of the roadway, which will be two-way for traffic; Phase 5 - works are carried out on the roadway of Crnotravska Street (in the direction of the city) in the area of the vehicle entrance to the "VMA" parking lot, in a length of 20 meters in a period of 23 . 07. to 29. 07.202 6. year. During the execution of the works, the right lane will be occupied (looking towards the city), whereby JLPP vehicles will move in the free width of the roadway in the work zone with alternating passing regulated by temporary traffic lights and traffic signs Phase 6 - the works are carried out on the roadway of Crnotravska Street (direction towards the city) in the area of the intersection of Raška Street, in a length of 20 meters for a period of 30 . 07. to 05. 08.202 6. year. During the works, the right lane will be occupied (looking towards the city), and JLPP vehicles will move in the work zone the free width of the roadway with alternating passing regulated by temporary traffic lights and traffic signs. During the execution of works in the mentioned phases, trolleybus line no. 40 will run on a shortened route to the old "Banjica" turnpike. Work zone Select line 40L [Zvezdara - Banjica] 41A [Student square - Banjica 2] 41A [Student square - Banjica 2] 42 [Petlovo brdo - Trg Slavija - Petlovo brdo] 42 [Petlovo brdo - Trg Slavija - Petlovo brdo] 47N [Trg Republike - Resnik / Railway Station/] 47N [Trg Republike - Resnik /Zeleznička Stanica/] 49 [Banovo brdo - Settlement of Stepa Stepanović] 49 [Banovo brdo - Settlement of Stepa Stepanović] 59 [Slavija/Birčaninova - Petlovo brdo ] 59 [Slavija/Birčaninova - Petlovo brdo ] 78 [Banjica 2 - Zemun /Novi Grad/] 78 [Banjica 2 - Zemun /Novi Grad/] 80 [Čukarič ka padina - IKEA] 80 [Čukarička padina - IKEA] 94 [Novi Beograd /Blok 45/ - Resnik /Edvarda Griga/] 94 [Novi Belgrade /Blok 45/ - Resnik /Edvarda Griga/]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the execution of emergency works in the street 13. Oktobra (Rakovica)
Information about the change in the operating mode of public transport lines during the execution of emergency works in the street 13. Oktobra (Rakovica) 504 47N 94 05/13/2026 - 05/29/2026 The works are extended until 05/29/2026. year. During the execution of emergency works on the rehabilitation of the sewage network in 13. Oktober Street (Rakovica), on the part from the entrance to the asphalt base of PUK "Beograd put" to the crossing over the tunnel "Beogradske obilaznica" in the period from 13.05. from 09:00 a.m. to 05/20/2026. year, there will be changes in the operation of public transport lines. During the execution of the works, the section in question will be closed to traffic, which is why public transport vehicles will travel as follows: Vehicles from line no. 94 will run in both directions on the streets of Oslobođenja, Rakovica roundabout, Stara Straževica tunnel, Slavko Miljkovića roundabout and Rakovica roundabout , Slavko Miljković, Edvard Grig to the terminus "Resnik (Edvard Grig)"; Vehicles from lines no. 504 and 47N will run in both directions on Oslobođenja, Rakovica roundabout, Stara Straževica tunnel, Slavko Miljkovića roundabout and Rakovica roundabout, Slavko Miljkovića, Podavalsko, Palih borac, 13 Oktober, Milorad Jankovića Doca and on regular routes. Vehicles will use all existing stops on the changed sections of the route. Work zone Select line 47N [Trg Republike - Resnik /Railway Station/] 94 [Novi Beograd /Blok 45/ - Resnik /Edvarda Griga/] 504 [Vidikovac - Resnik /Railway Station/]
Beograd
Source
24.05.2026
transport
19:16
Information about the change in the mode of operation of public transport lines during the execution of works in Byzantijska Street in Veliko Mokro Lugo - Phase 13
Information about the change in the operating mode of public transport lines during the performance of works in Byzantijska Street in Veliki mokrom lugo - Phase 13 38 312 304N 22/05/2025 - 24/05/2026 The works have been extended until 24/05/2026. year During the performance of works on the reconstruction of the water supply network in Byzantijska street in the period from 15.05. by 20.05.2026, there will be changes in the operation of public transport lines. The works are being carried out on the roadway (right traffic lane) in Byzantijska Street, on the part of the intersection zone with Nikola Grulovića Street, the next 60 meters in the direction of Stražarska kosa Street. During the execution of the works, due to the technology of the works, it will not be possible for buses to pass through the work zone, which is why vehicles from line no. 38, 308 and 304N travel abbreviated to the old turnpike "MZ Veliki mokri lug". Vehicles with and lines no. 312 will move in the height of the work zone in the left traffic lane with a width of at least 3.0 meters with alternating passing regulated by temporary traffic signs. Work zone Select line 38 [Šumice - Pogon Kosmaj - Veliki Mokri lug] 304N [Studentski trg - Veliki mokri lug - Leštane - Boleč - Ritopek] 312 [MZ Veliki mokri lug - Kumodraž - Medaković - Kumodraž - MZ Veliki mokri lug]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the execution of works in Banatska Street
Information about the change in the mode of operation of public transport lines during the performance of works in Banatska Street 85 103 112 612 105l 07/05/2026 - 01/09/2026 During the performance of works on the installation of fecal sewage in Banatska Street (Zemun), there will be changes in the operation of public transport lines. The works will be carried out in phases, namely: Phase 4 - the works in this phase involve the complete closure of Banatska Street for traffic in the part from the intersection zone with Somborska Street (including the intersection itself) to the intersection zone with Ugrinovačka Street. Works in this phase will be carried out in the period from 07.05. until 27.05.2026. year. Phase 4a - works in this phase involve the complete closure of Banatska Street to traffic in the part from the intersection zone with Somborska Street (free intersection) to the intersection zone with Ugrinovačka Street. Work these in this phase will be performed in the period from 05.28. until 12.06.2026. year. Phase 3 - the works in this phase involve the complete closure of Banatska Street for traffic on the part from the intersection zone with Niška Street to the intersection zone with Somborska Street. Works in this phase will be carried out in the period from 13.06. until 15.07.2026. year. Phase 2a - works in this phase involve the complete closure of Banatska Street to traffic in the part from the intersection zone with Cara Dušana Street to the intersection zone with Niška Street (including the intersection itself). Works in this phase will be carried out in the period from 16.07. until 05.08.2026. year. Phase 2 - works in this phase involve the complete closure of Banatska Street for traffic on the part from the intersection zone with Cara Dušana Street to the intersection zone with Niška Street (free intersection) . Works in this phase will be carried out in the period from 06.08. until 01.09.2026. year. During the execution of works in all phases, public transport vehicles will operate as follows: Line no. 85 in the direction of Banovo brdo will continue to travel through the streets of Cara Dušan, Filip Višnjić, Ugrinovačka and continue regularly, while in the direction of Borča it will continue through the streets of Ugrinovačka, Autoput za Novi Sad, Spojna magistralna tangenta, Pupinov most and continue along the regular route; Line no. 103, 105L and 112 in the direction of the terminus "Zemun (Bačka)" will travel along the streets of Cara Dušan, Filip Višnjić, Ugrinovačka, Bačka to the terminus "Zemun (Bačka)", while in the direction of Borča and Ovča they will travel from the terminus "Zemun (Bačka)" through the streets Bačka, Ugrinovačka, Autoput za Novi Sad, External main tangent, Pupinov bridge and still regular routes; Line no. 612 will u in the direction of New Belgrade, traffic will continue on the streets of Car Dušan, Filip Višnjić, Rad Končar, while in the direction of Nova Galenica, traffic will continue on the streets of Ugrinovačka, Autoput za Novi Sad, Spojna magistralna tangenta, Car Dušan and continue on the regular route. Work zone Select line 85 [Banovo brdo - Borča 3] 103 [Zemun /Bačka/ - Padinska skela] 105l [Zemun (Bačka) - Ovča (railway station)] 112 [Zemun /Bačka/ - Reva /Duboka bara/] 612 [Novi Beograd /Blok 20/ - Nova Galenika]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the execution of works in Marko Čelebonović, Nikola Dobrović and Partizanska avijacija streets - Phase 4
Information on the change of operation mode of public transport lines during the performance of works in the streets of Marko Čelebonović, Nikola Dobrović and Partizanska avijacija - Phase 4 65 70 72 74 75 76 82 612 613 708 72N 607 05/21/2026 - 25/05/2026 During the performance of regular maintenance works in the street of Nikola Dobrovića - Phase 4 in the period of 21 . 05. 2026 to 25 0 5 . 202 6. there will be changes in the operation of public transport lines. The works involve the closure of the right lane of Nikola Dobrovića street for traffic from the intersection zone with Partizanske avijacije street to the intersection zone with General Mihajlo Nedeljkovića street (seen in the direction of Tošin bunar street). The far right traffic lane of Partizanska avijacija Street will continue to be occupied on the approach to the intersection with Marko Čelebonovića Street (viewed in in the direction of Marko Čelebonovića Street) in a length of 35 meters, as well as the right traffic lane of Marko Čelebonovića Street at the exit from the intersection with Partizanske Avijacije Street (seen in the direction of Dr. Hugo Klajna Street) in a length of 110 meters (with the cancellation of the stop "Nikola Dobrovića" - direction of Dr. Hugo Klajna Street). In addition to this, the rightmost traffic lane of Marko Čelebonovića Street on the approach to the intersection with Partizanske Avijacije Street (seen in the direction of Partizanske Avijacije Street) will be closed for 35 meters, as well as the right traffic lane of Partizanske Avijacije Street at the exit from the intersection with Marko Čelebonovića Street (seen in the direction of Gandijeva Street) in a length of 100 meters. During the works, public transport vehicles will operate as follows: Lines b r. 65, 70, 612 and 613 in the direction of Bežanijska kosa, Bežanijska groblje, Nova Galenica and the Radiofar settlement will run on their regular routes (line no. 612 in accordance with the works in Banatska Street), while in the direction of the city they will run on the streets of Marko Čelebonović, Partizanske avijacija, Dr. Žorž Matea, Tošin bunar, Bulevar Milutin Milankovića and on regular routes; Line no. 72 and 82 will run on their regular routes in the direction of Nikola Tesla Airport and Block 44, while in the direction of the city they will run on the streets of Marko Čelebonović, Partizanska avijacije, Dr. Žorž Mateo, Boulevard Zorana Đinđić and further on regular routes; Line no. 607 in the direction of "Nikola Tesla" Airport will drive through the streets of Bulevar Heroja from Košar, Tošin bunar, the exit ramp to Motorway M11 (direction to Šid), Motorway M11 and yes lje on the regular route, while in the direction of the city they will drive on the streets of Motorway M1 (direction to Niš) - entrance ramp from Motorway M11 to Tošin bunar, Tošin bunar, Bulevar Heroja from Košar and further on the regular route. The following public transport lines will continue to operate on the modified routes: Line no. 74, 75 and 72N in the direction of the "Bežanijska kosa" turnpike will travel on the streets of Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajna and continue on regular routes, while in the opposite direction they will travel on their regular routes; Line no. 76 in the direction of KBC "Bežanijska kosa" will run on the streets of Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajn, Rajkova and further in accordance with the works in Dr. Žorža Matea Street, while in the opposite direction it will travel in accordance with the works in Dr. Žorža Matea Street (on the regular route after the completion of these works); Line no. 708 will travel in the direction of Zemun polje on the streets of Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajn, Marko Čelebonović and continue on the regular route, while in the opposite direction it will travel on its regular route. Vehicles on the modified sections of the route will use the existing and temporarily established stops: "Nikole Dobrovića 1" - (#3975), for lines no. 65, 70, 72, 82, 612 and 613 in Nikola Dobrovića street, at a position about 80.0 meters in front of the intersection zone with Partizanske avijacije street; "Nikole Dobrovića 2" - (#4167) for lines no. 74, 75, 76, 708 and 72N in Partizanske avijacije street, at a position about 100.0 meters in front of the intersection zone with Marko Čelebonovića street (seen in the direction of Gandijeva street); "Peđe Milosavljevića 1" - (#3977) for lines no. 74, 75 and 72N in the street and Peđa Milosavljević, at the position immediately in front of the intersection zone with Dr. Hugo Klajna street, while vehicles from line no. 76 and 708 use the regular stop "Peđe Milosavljevića" - (#225) in Dr Hugo Klajna Street in the direction of Marko Čelebonovića Street. Work zone Select line 65 [Zvezdara 2 - Novo Bežanijsko Groblje] 70 [Bežanijska kosa - IKEA] 72 [Zeleni Venac - Nikola Tesla Airport] 72N [Trg republike - Nikola Tesla Airport] 74 [Bežanijska Kosa - Mirijevo 3] 75 [Zeleni Venac - Bežanijska Kosa] 76 [Novi Beograd /Blok 70A/ - Bežanijska Kosa/Hospital/] 82 [Zemun /Kej Oslobođenja/ - Blok 44] 607 [Banovo Brdo - Nikola Tesla Airport] 612 [Novi Beograd /Blok 20/ - Nova Galenika] 613 [Novi Beograd /Pavilions/ - Radiofar] 708 [Novi Beograd /Blok 70A/ - Zemun Polje]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of the public transport line during the works in the streets of Marko Čelebonović and Partizanska avijacije
Information on the change in the mode of operation of the public transport line during the performance of works in the streets of Marko Čelebonović and Partizanska avijacije 65 70 72 74 75 76 82 612 613 708 72N 607 14/05/2026 - 13/06/2026 During the continuation of the performance of regular maintenance works in the streets of Marko Čelebonovića and Partizanska avijacija - Phase 3 in the period of 14. 05. 2026 until 13 06. 202 6. year, there will be changes in the operation of public transport lines. The works involve the closure for traffic of the far right traffic lane of Partizanska avijacije street on the approach to the intersection with Marko Čelebonovića street (seen in the direction of Marko Čelebonovića street) for a length of 35 meters, as well as the right traffic lane of Marko Čelebonovića street at the exit from the intersection with Partizanska avijacija street (seen in the direction of Dr Hugo Klajna street) for a length of of 110 meters (with the cancellation of the stop "Nikola Dobrovića" - direction Dr. Hugo Klajna) and the right traffic lane of Nikola Dobrovića Street at the exit from the intersection with the street Partizanske avijacije (seen in the direction of Tošin Bunar Street) in a length of 110 meters (with the cancellation of the stop "Nikola Dobrovića" - direction Tošin Bunar Street). In addition to this, the rightmost traffic lane of Marko Čelebonovića Street on the approach to the intersection with Partizanska avijacije street (seen in the direction of Partizanska avijacije street) is closed for traffic for a length of 35 meters, as well as the right traffic lane of Partizanska avijacija street at the exit from the intersection with Marko Čelebonovića street (seen in the direction of Gandijeva street) for a length of 100 meters. During the works, public transport vehicles will still move on to the next one method: Line no. 74, 75 and 72N in the direction of the "Bežanijska kosa" turnpike will travel on the streets of Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajna and continue on regular routes, while in the opposite direction they will travel on their regular routes; Line no. 76 will travel in the direction of KBC "Bežanijska kosa" on the streets of Partizanska avijacije, Peđa Milosavljević, Dr. Hugo Klajn, Rajkova and further in accordance with the works in Dr. Žorža Matea Street (regular route after the completion of these works), while in the opposite direction it will travel in accordance with the works in Dr. Žorža Matea Street (regular route after the completion of these works); Line no. 708 will travel in the direction of Zemun polje on the streets of Partizanska avijacije, Peđa Milosavljević, Dr. Hugo Klajn, Marko Čelebonović and continue on the regular route, while in the opposite direction it will travel on its regular route. Vehicles on the modified sections of the route will use the existing and temporarily established stops: "Nikole Dobrovića 1" - (#3975), for lines no. 65, 70, 72, 82, 612 and 613 in Nikola Dobrovića street, at a position about 80.0 meters in front of the intersection zone with Partizanske avijacije street; "Nikole Dobrovića 2" - (#4167) for lines no. 74, 75, 76, 708 and 72N in Partizanske avijacije street, at a position about 100.0 meters in front of the intersection zone with Marko Čelebonovića street (seen in the direction of Gandijeva street); "Peđe Milosavljevića 1" - (#3977) for lines no. 74, 75 and 72N in Peđe Milosavljevića Street, in a position immediately in front of the intersection zone with Dr Hugo Klajna Street, while vehicles from lines no. 76 and 708 use the regular stop "Peđe Milosavljevica" - (#225) in Dr Hugo Klajna Street in u towards Marko Čelebonovića Street. Work zone Select line 65 [Zvezdara 2 - Novo Bežanijsko Groblje] 70 [Bežanijska kosa - IKEA] 72 [Zeleni Venac - Nikola Tesla Airport] 72N [Trg republike - Nikola Tesla Airport] 74 [Bežanijska Kosa - Mirijevo 3] 75 [Zeleni Venac - Bežanijska Kosa] 76 [Novi Beograd /Blok 70A/ - Bežanijska Kosa/Hospital/] 82 [Zemun /Kej Oslobođenja/ - Blok 44] 607 [Banovo Brdo - Nikola Tesla Airport] 612 [Novi Beograd /Blok 20/ - Nova Galenika] 613 [Novi Beograd /Pavilions/ - Radiofar] 708 [Novi Beograd /Blok 70A/ - Zemun Polje]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the execution of works in Dr. Žorža Matea Street
Information on changes to the operating mode of public transport lines during the performance of works in Dr. Žorža Matea Street 76 77 14/05/2026 - 13/06/2026 During the performance of regular maintenance works in Dr. Žorža Matea Street and Auto-put za Zagreb, GO Novi Beograd, in the period of 14. 05. until 13. 06. 202 6. from the year 2016 onwards, the roadway will be fully occupied on Dr. Žorža Matea Street, from the intersection with Auto-put za Zagreb Street to Marije Bursać Street, in a length of 270.0 meters, and also part of the right traffic lane in the continuation of Dr. Žorža Matea Street to Marije Bursać Street and the right traffic lane on Auto-put za Zagreb Street in the internal part of this road, in the direction of Dr. Žorža Matea Street. During the execution of the works, there will be changes in the operation of public transport lines no. 76 and 77, which will operate as follows: Line a no. 76 will in in the direction of Bežanijska kosa drive on the regular route to the "Hotel Nacional" stop, from where you will drive to Partizanske avijacije street, then on the overpass over the M11 Motorway (Arsenija Čarnojevića Boulevard) to the roundabout in the intersection area of Partizanske avijacije streets and Autoput za Zagreb and further on the second right-hand internal road to Dr. Žorža Matea street (using stop #1852, "Bežanijska kosa"), and further on on the regular route, while in the direction of the city it will continue to run regularly until the stop "Zelengorska" and further on the internal road to the roundabout in the area of the intersection of Partizanske avijacije Street and Auto-put za Zagreb, Partizanske avijacije and still regularly (and in accordance with the works in Partizanske avijacije Street), Line no. 77 in the direction of the city will continue to operate on the streets: Dr. Žorža Ma tea, along Auto-put za Zagreb street to the roundabout in the area of the intersection of Partizanske avijacije streets and Autoput za Zagreb and further along the internal road to Dr Žorža Matea street and further along the regular route while in the direction of Bežanijska kosa they will drive through the following streets: Dr Žorža Matea street, along Auto-put za Zagreb to the roundabout in the area of intersection of Partizanske avijacije streets and Autoput za Zagreb and further on the second right internal traffic road to Dr Žorža street Matea (using stop #1852, "Bežanijska kosa"), still regularly. Work zone Select line 76 [Novi Beograd /Block 70A/ - Bežanijska Kosa/Hospital/] 77 [Zvezdara - Bežanijska Kosa /Hospital/]
Beograd
Source
24.05.2026
transport
19:16
Zvezdara
Information about the change in the mode of operation of the public transport line during the execution of works in Crnotravska Street
Information about the change in the mode of operation of the public transport line during the performance of works in Crnotravska Street 40 40L 05/05/2026 - 05/26/2026 During the performance of works on the reconstruction of the distribution hot water network of Crnotravska Street in the period from 5.5. until 26.5.2026. year, there will be changes in the operation of public transport lines. The works will be carried out in phases, namely: Phase 8 - the works are carried out in the right carriageway on Crnotravska Street (seen in the direction of Banjica), on the part of the position located about 40 meters after the car entrance to the "VMA" parking lot, the next 85 meters seen in the direction of Banjica. The works will be carried out in a period of 5. 5 to 11 5.202 6. year. During the execution of the works, the right lane will be occupied (as viewed in the direction of Banjica), whereby JLPP vehicles will move on the left lane in the work zone. nom lane that will be two-way for traffic. Phase 7 - works are carried out in the right carriageway on Crnotravska Street (looking towards the city), on the part of the intersection zone with Kraljice Ana Street, the next 70 meters looking towards the city. The works will be carried out in a period of 12 5 to 14 5. 202 6. year. During the works, the right lane will be occupied (looking towards the city), while JLPP vehicles in the work zone will move on the left lane, which will be two-way for traffic. Phase 1 - the works are a continuation of the works from phase 7, the next 130 meters in the direction of the city. The works will be carried out in a period of 15 5 to 26 5.202 6. year. During the execution of the works, the right lane will be occupied (as viewed in the direction of the city), while JLPP vehicles will be in the zone of to move on the remaining width of the road, which will be two-way for traffic. During the execution of works in the mentioned phases, trolleybus line no. 40 will run abbreviated to the old "Banjica" turnpike. Also, the bus stop "Plivalište Banjica" (direction towards the city) is temporarily moved to a position that is located about 100 meters in front of the regular position. Work zone Select line 40L [Zvezdara - Banjica] 40L Zvezdara - Banjica Banjica - Zvezdara Information about the change of mode of operation of public transport lines during the works on Crnotravska street Show timetable Name Code Zvezdara #257 Miloša Jankovića #255 City Hospital #253 Čegarska #251 Živojina Žujovića #250 Marko Oreškovića #248 Podvožnjak #246 Zdravka Čelara #244 Jaše Prodanovića #242 Main post office #266 Admiral Geprat #268 Miloš Pocerc # 271 "BGD Center" Railway Station #273 Museum of Yugoslavia #275 "Partizan" Stadium #277 Pedagogical Academy #1994 "Dragiša Mišović" Hospital #279 Paje Adamova #281 Military Academy #284
Beograd
Source
24.05.2026
transport
19:16
Surčin
Information about the change in the mode of operation of the lines during the execution of works in Karađorđeva Street
Information about the change in the operating mode of the lines during the performance of works in Karađorđeva Street 51 511 601 2A EKO2 2L1 2 11 51N 601N 04/04/2026 - 01/08/2026 During the performance of works on tram tracks and contact network in Karađorđeva Street, in the period from 04.04. to 0 1 .08.2026. there will be changes in the operation of public transport lines. The works are being carried out in the tram yard in Karađorđeva Street, on the part from the roundabout near Geozavod (the right side of the roundabout will be disabled when viewed in the direction of the Fair) to Savski Square (new SAO Street 6). During the execution of the works, the section in question (Karađorđeva street) will be closed to traffic, and JLPP vehicles will operate as follows: tram lines no. 2 and 11; temporary tram line no. 2L will continue to operate on the route Pri habitat - Dorćol - Vuk's monument - Trg Slavija - Gospodarska mehana; temporary bus line no. 2A ("Dorćol /SRC Milan Gale Muškatirović/ - Belgrade on the water - "Dorćol /SRC Milan Gale Muškatirović/" will operate on the route: DORĆOL /SRC"MILAN GALE MUŠKATIROVIĆ"/ - Tadeusa Košćuš og a - Bulevar vojvode Bojovića - Karađorđeva - SAO 9 (a new street located along the banks of the Sava, in the part from the area of the Branko bridge to the roundabout at of the former BAS) - roundabout near the former BAS - BELGRAD NA VODI - Boulevard Vudroa Wilson - SAO 9 - roundabout near Geozavod - Tadeuska Košćušk - DORĆOL /SRC"GALE MUSKATIROVIĆ"/; vehicles from lines no. 51, 511, 601 2 in the direction of the Fair and Slavija Square, will drive through the streets of Bulevar Vudr oa Wilson, SAO 4 (Kraljice Draga Obrenović), SAO 6 (Luke Ćelovića Trebinjca), Savski trg Bulevar kralja Aleksandra I Karađorđevića (Savska) and further on regular routes; vehicles from line no. 51, 511, 601, 51N and 601N in the direction of the terminus "Belgrade na Vodi", towards the settlement of Bele Vode and Surčin, will travel along the streets Bulevar Kralja Aleksandar I Karađorđević (Savska), Nikolaj Kravtsov, Bulevar Woodrow Wilson to the terminus "Beograd na Vodi"; vehicles from the EKO2 line will travel in the direction of the "Belgrade na Vodi" terminus, on the streets of Nemanjin, King Aleksandar I Karađorđević (Savska) Boulevard, Nikolaj Kravtsov, Woodrow Wilson Boulevard to the "Belgrade na Vodi" terminus. On the changed part of the route, vehicles will use all existing stops, as well as newly established temporary stops for line no. 2A: "Pier 1" (sme r towards Brankova most) in Karađorđeva Street at the position of the ED pillar which is located 5 meters in front of the stop line in the zone of house number 11; "Pristanište 1" (direction to Kalemegdan) in Karađorđeva Street at the position of the ED pillar located 10 meters in front of the stop line in the area of Velika Stepica Street. The "Brankov Most" bus stop (direction to Fair) for line no. 2A. Work zone Select line EKO2 [SRC Milan Gale Muškatirović - Beograd na Vodi] 2A [Dorćol SRC MGM - Beograd na vodi - Dorćol SRC MGM] 2L1 [Pristanište - Trg Slavija - Pristanište] 51 [Belgrade na vodi - Bele Vode] 51N [Trg Republike - Bele Vode] 511 [Belgrade na vodi - Sremčica] 601 [Belgrade na vodi - Surčin] 601N [Trg Slavija - Surčin]
Beograd
Source
24.05.2026
transport
19:16
Information about the temporary cancellation of the stop "Glavna pošta" in Takovska street, in both directions
Information on the temporary cancellation of the stop "Glavna pošta" in Takovska street, in both directions 23 28 40 41A 304N 08/04/2026 - 25/05/2026 The works have been extended until 25/05/2026. year. During the performance of regular maintenance works in Takovska Street, on the stretch from Kosovska Street to George Washington Street, in the period from 04/08 to 04/30/2026. year, there will be a temporary cancellation of the public transport stop "Glavna pošta" (in both directions) for lines no. 23, 40 and 304n.
Beograd
Source
24.05.2026
transport
19:16
Lazarevac
Information about the cancellation of the "Savski trg (Savska)" stop during the reconstruction of the Post Office building in Savska Street
Information about the cancellation of the "Savski trg (Savska)" stop during the reconstruction of the Post Office building in Savska Street 36 51 511 601 581N 860N 12/20/2024 - 12/31/2026 The works have been extended until 12/31/2026. year. During the works on the reconstruction of the Post Office building (in the function of repurposing the building into a cultural center) in Savska Street in the period from 12/20/2024. until 31.03.2025. there will be changes in the operation of public transport lines. During the execution of the works, there will be occupation of the far right traffic lane in the direction of the Fair, on the part from the post office building to the area of the "Savski trg (Savska)" bus stop. JLPP vehicles will move in the work zone on the remaining free width of the roadway (left traffic lane). During the execution of the works, the bus stop "Savski trg (Savska)" (code st. #1726 for lines no. 36, 51, 511 and 601 - seen in the direction of the Fair). Work zone Select line 36 [Ž.Ct. Bgd (Center) - Ž.Ct. Bgd (Center)] 51 [Belgrade on the water - Bele Vode] 511 [Belgrade on the water - Sremčica] 581N [Trg Slavija - Lazarevac] 601 [Belgrade on the water - Surčin] 860N [Trg Slavija - Obrenovac]
Beograd
Source
24.05.2026
transport
19:16
Novi Beograd
Information about the change in the mode of operation of public transport lines during the execution of works in Zemunski put street
Information about the change in the mode of operation of public transport lines during the execution of works in Zemunski put street 60 9A 26/11/2025 - 04/11/2026 During the execution of works on the removal of the Old Sava bridge and the construction of a new bridge in Zemunski put street, in the part from the intersection zone with Vladimira Pop o vič street to the intersection zone with Zarija Vujuošević and Sajmište streets in the period of 26 .11.2025. until 04. 11.202 6. there will be changes in the operation of public transport lines. The works involve the occupation of the tram yard and the far right traffic lane (seen in the direction of the city), while the far left traffic lane will be free for traffic, and it will be directed towards Zeleni venc. Vehicles from public transport lines will travel as follows: Vehicles from line no. 9A: - in the direction of Trg Slavija will sa address the streets of Milentij Popović, the tram garden (on the part from Milentij Popović to Vladimir Popović), then turn into the far left traffic lane (looking towards the city) of the streets Zemunski put, Sajmište and continue along the regular route; - in the direction of New Belgrade, there will be traffic on the streets of Brankov Most, the internal road that leads to Ušće Street, the right turn under Brankovo Most, which is located near the skate park "Brankov Most", Sajmište, the roundabout near Sajmište camp, Staro Sajmište, Sajmište, the roundabout near TC "Ušće", Mihajla Pupin Boulevard, Milentija Popovića and further along the regular route. She drove line no. 60 will run regularly in both directions. A temporary stop is being established: "Staro Sajmište" (code st. #1051 - direction to Brankova most) for line no. 9A, which in regular mode corri sti line no. 60; "Staro Sajmište 1" (direction towards terminus Block 72 /TC "Eurasija"/) for lines no. 9A and 60, which is temporarily established in Staro Sajmiše Street at the position of the EDB pillar located about 40 meters in front of the intersection zone with Sajmište Street. The stop: "Staro Sajmište" (code st. #117 - direction to Brankova most) for line no. 9A. Work zone Select line 9A [Block 72 /TC Euroazija/ - Trg Slavija - Block 72 /TC Euroazija/] 60 [Zeleni Venac - Museum of Contemporary Art - New Belgrade /Toplana/]
Beograd
Source
24.05.2026
transport
19:16
Zemun
Information about the change in the mode of operation of public transport lines during the execution of works in Dobrovoljačka Street
Information on the change in the operating mode of public transport lines during the performance of works in Dobrovoljačka Street 45 83 09/23/2025 - 09/15/2026 During the performance of works on the reconstruction of Dobrovoljačka Street, in the part from Cara Dušana Street to Ugrinovacka - phase 1, GO Zemun, which will be carried out in the period from 09/23/2025 to 09/15/2025. In 2026, there will be a suspension of traffic in Dobrovoljačka Street, whereby public transport lines will run as follows: - Line no. 45 in the direction of Zemun /Novi grad/ will run through the streets of Cara Dušan, Filip Višnjić, Rada Končar and further along the regular route, while in the direction of Block 44 it will run regularly, - Line no. 83 in the direction of Zemun/Bačka/ will travel along the streets of Cara Dušan, Filip Višnjić, Ugrinovačka and further along the regular route, while in the direction of the Red Cross there will be a ram (and in accordance with the orders for the removal of the Old Sava bridge). A temporary stop "Filipa Višnjića 2" (# 3573) is being established, for line no. 45, in Filipa Višnjića street, at the height of house number 30, in the direction of Ugrinovačka street, just before the intersection with Rada Končara - Ugrinovačka streets. Vehicles will use all existing stops on the changed part of the route. Work zone Select line 45 [Block 44 - Zemun /Novi grad/] 83 [Crveni Krst - Zemun /Bačka/]
Beograd
Source
24.05.2026
transport
19:16
Zemun
Information about the change in the traffic regime and the mode of operation of public transport lines during the works on the removal of the Old Sava Bridge
Information on the change of traffic regime and mode of operation of public transport lines during the performance of works on the removal of the Old Sava Bridge 7 9 78 83 7l 9A 9l 02/11/2024 - 02/09/2027 From Saturday 02 November, preparatory work on the dismantling of the Old Sava Bridge will begin. From the specified date, traffic on the bridge will be suspended and the shutdown and removal of installations will begin, followed by the removal of rails and pavement and finally the dismantling and removal of the supporting and main structure. In accordance with the above, from the specified date there will be changes in the traffic regime and the operation of public transport lines. First of all, the tram lines are being moved to the route over the Ada Bridge, which is why the following mode of operation of the public transport lines will apply: Tram lines e no. 7 and 9 will run in both directions, from the area of Savski trg, on streets Sa vska, Vojvode Mišić Boulevard, Petlja "Radnička", Most na Ada, Heroja sa Košar Boulevard, Crvena Armija Boulevard, Milutin Milankovića Boulevard, Anti-Fascist Struggle and still regularly up to Block 45 and will bear signs 7L and 9L. A temporary bus line no. 9A (Trg Slavija - Block 45), which will cover the part of the route on which trams will not run (Milutin Milanković Boulevard, Milentija Popovića and Sajmište Boulevard) and the route of line 9A will be: Trg Slavija, Nemanjina, Balkanska, Gavrila Principa, Pop Lukina, Brankov Most, temporary deviation to Ušće Street, Ušće (Mihajla Pupina Boulevard in the direction of the city), Sajmište, Zemunski put, by tram garden to Milentija Popovića street and further by regular tram routes to Block 45. Bus lines no. 78 and 83 are due from October 4 preparatory works and damage to the Old Sava bridge diverted to the Brankov bridge route and traffic on the streets: Nemanjina, Balkanska, Gavrilo Principa (Admiral Geprato in the direction of Banjica, i.e. Red Cross), Pop Lukina, Brankov bridge, Mihajla Pupin Boulevard and further regularly to Zemun. Vehicles will use the existing as well as the newly established temporary stops "Kamenička 1" and "Brankov most 1" for lines no. 9A, 78 and 83 - direction towards Trg Slavija, i.e. "Staro sajmište" - direction towards Block 45 for line no. 9A. Regarding the traffic regime, we convey information from the Secretariat for Traffic and inform you that on the right bank of the Sava, vehicles will be informed by traffic signals that the bridge is closed and will be directed towards the Branko Bridge. In Karađorđeva street, at the intersection with Zemunski pute, another traffic lane will be added, so that there will be two traffic lanes in continuity on Karađorđeva, and one will be intended for the left turn in ul. Zemun road. Also, the operation of traffic lights has been adapted to this change. On the Novobeograd side, access to the bridge will be prohibited at all times and drivers will be informed about this by means of traffic signals. After the completion of the preparatory works, the traffic regime will be changed in such a way that vehicles will be able to move over the current tram yard in the direction from Milentij Popović to Zaria Vujošević and, from two lanes, turn into ul. Fairground. The Secretariat for Public Transport and the Secretariat for Transport will carry out constant monitoring of the defined temporary traffic regime and, if necessary, pass the necessary regulations measures in the direction of better quality transport and traffic while the works are in progress. Work zone Select line 7l [Ustanička - Block 45] 9A [Block 72 /TC Eurasia/ - Trg Slavija - Block 72 /TC Eurasia/] 9l [Banjica - Block 45] 78 [Banjica 2 - Zemun /Novi Grad/] 83 [Crveni Krst - Zemun /Bačka/]
Beograd
Source
24.05.2026
transport
19:16
Zvezdara
Information about the temporary relocation of the "Braće Ribnikar" stop during the works in Ruzveltova Street
Information about the temporary relocation of the "Braće Ribnikar" stop during the works in Ruzveltova Street 65 74 27N 10/10/2024 - 01/06/2026 The works have been extended until 01/06/2026. year. During the execution of works on the construction of a residential and business building in ul. Roosevelt no. 48, at the corner of St. Nikola and Stjepana Ljubiša streets, GO Zvezdara, in a period of 10 From October 10, 2024 to December 31, 2025, there will be occupation of the sidewalk along the building in the streets of Ruzveltovo, Sveti Nikola and Stjepana Ljubiša for the purpose of depositing materials. The bus stop for lines no. 65, 74 and 27N, "Braće Ribnikar" (# 1080, heading towards Zvezdara and Mirijevo), about 70.0 meters after the regular position, in St. Nikola Street, at the height of number 6.
Beograd
Source
24.05.2026
transport
19:16
Mladenovac
Information about the change in the mode of operation of public transport lines during the execution of works in the streets of Sveti Joakim and Ana in the Međulužje settlement (GO Mladenovac)
Information about the change in the mode of operation of the public transport lines during the works in the streets of Svetog Joakim i Ana in the settlement of Međulužje (GO Mladenovac) 4192 4192a 07/06/2024 - 31/12/2026 During the performance of works on the regular maintenance of the streets of Svetog Joakim i Ana in the settlement of Međlužje (GO Mladenovac), in the section between house numbers 61 and 69, there will be changes in the operation of lines no. 4192 and 4192A. The works will be performed in the period from June 7, 2024. until December 31, 2026. year and the same implies the complete closure of the section in question, which is why vehicles from line no. 4192 and 4192A to drive through the streets of Vojvoda Vićenti, Balkanska, Stefan Nemanja, Paja Jovanović, Vojvoda Vićenti and further on regular routes. Work zone Select line 4192 [Razvitak - Međulužje - Bataševo - Drapšin] 4192a [Razvitak - Međlužje - Mladenovac]
Beograd
Source
24.05.2026
transport
19:16
Obrenovac
Information on the change of mode of operation of public transport lines no. 860U due to damage to the bridge above the canal in the street of Gola Bara in the settlement of Ušće - Municipality of Obrenovac
Information on the change of mode of operation of public transport lines no. 860U due to damage to the bridge over the canal in Gola Bara Street in the settlement of Ušće - Obrenovac Municipality 860U 05/05/2023 - 05/31/2026 The works have been extended until 05/31/2026. year. Based on the Decision of the Secretariat for Transport on the technical regulation of traffic, and according to the technical documentation "Special organization of traffic in the area of the bridge ID 364 over the canal in Gola Bara Street, MZ Ušće, Municipality of Obrenovac", the route of public transport line no. 860U in the Ušće settlement itself due to restrictions on the movement of vehicles whose total weight exceeds 3.5t. During the duration of this restriction, public transport lines no. 860U will run on a shortened route to the old turnpike in the Ušće settlement. On the changed part of the route, vehicles will use temporary stops in the zone ma of the same names for the opposite direction. Work zone Select line 860u [Industrial zone Barič - Ušće] 860u Industrial zone Barič - Ušće Ušće - Industrial zone Barič Show timetable Name Code Industrial zone Barič #8763 Mislođinski kanal #8729 Barič - Exit #8761 Mislođin r #9064 Bazeni #8848 Naselje Dudovi #8876 Obrenovac AS #9087 Black point #9253 October 14 #7023 Zvečka - Piroćanci #9119 Zvečka - overpass #9077 Zvečka - Isailovići #8944 Zvečka - Petronijevići #9112 Zvečka - Radio station #9129 Ratari - Nurča #9084 Ratari - Miškovići #9071 Ratari - Home #9138 Ratari - Čivija #9396 Skela - Monument #9175 Skela - Vrovi #8832 Skela - Markulići #9045 Skela - Home #9166 Skela - Paležpromet #9171 Skela - Savski cvet #9158 Skela - Kanal #9168 Ušće - Vorbis #9237 Ušće - Tent I #9239 Ušće - Ten t II #9241 Ušće - Tavern #9238 Ušće - Orchard #8830 Ušće - Jakšići #8950 Ušće - turnpike #9089
Beograd
Source
Today
transport
08:12
Novi Beograd
Information about the change in the mode of operation of the public transport line during the works in the area of the intersection of Partizanske avijacija, Marko Čelebonovića and Nikola Dobrovića - Phase 5
Information on the change in the operating mode of the public transport line during the works in the area of the intersection of Partizanska avijacije, Marko Čelebonovića and Nikola Dobrovića - Phase 5 65 70 72 74 75 76 82 612 613 708 72N 607 05/26/2026 - 05/30/2026 During the regular maintenance works in Nikole Street Dobrovića - Phase 5 in the period of 2 6 . 05. 2026 to 30 0 5 . 202 6. there will be changes in the operation of public transport lines. The works involve the closure of the right lane of Nikola Dobrovića street for traffic from the intersection zone with General Mihajlo Nedeljkovića street to the intersection zone with Partizanske avijacije street (seen in the direction of Partizanske avijacije street). The far right traffic lane of Partizanska avijacije street will continue to be occupied on the approach to the intersection with the street Marko Čelebonovića (seen in the direction of Marko Čelebonovića street) in a length of 35 meters, as well as the right traffic lane of Marko Čelebonovića street at the exit from the intersection with Partizanske avijacije street (seen in the direction of Dr. Hugo Klajna street) in a length of 110 meters (with the cancellation of the "Nikola Dobrovića" stop - direction to Dr. Hugo Klajna street). In addition to this, the rightmost traffic lane of Marko Čelebonovića Street on the approach to the intersection with Partizanske Avijacije Street (seen in the direction of Partizanske Avijacije Street) will be closed for 35 meters, as well as the right traffic lane of Partizanske Avijacije Street at the exit from the intersection with Marko Čelebonovića Street (seen in the direction of Gandijeva Street) in a length of 100 meters. During the works, public transport vehicles will traffic lines as follows: Lines no. 65 and 612 in the direction of the New Bezanijski cemetery and Nova Galenica will travel along the streets Milutin Milanković Boulevard, Tošin bunar, Dr. Žorž Mateo, Partizanska avijacije, Peđa Milosavljević, Dr. Hugo Klajn, Marko Čelebonović and further along their regular routes (line no. 612 in accordance with the works in Banatska Street), while in the direction of the city they will travel along regular routes; Line no. 70 and 613 in the direction of Bežanijska kosa and the Radiofar settlement will travel along the streets Milutin Milanković Boulevard, Tošin Bunar, Dr. Žorž Mateo, Partizanske avijacije, Peđa Milosavljević, Dr. Hugo Klajna and continue on their regular routes, while in the direction of the city they will travel along regular routes; Line no. 72 in the direction of "Nikola Tesla" Airport will travel along the streets Zoran Đinđić Boulevard, Dr. Žorža Matea, Par Tizan Aviation, Peđa Milosavljević, Dr. Hugo Klajna will continue on their regular route, while in the direction of the city they will operate on regular routes; Line no. 82 in the direction of Block 44 will travel along the streets Zoran Đinđić, Dr. Žorž Mateo, Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajn, Marko Čelebonović and continue along its regular route, while in the direction of Zemun it will travel along the regular route; Line no. 607 in the direction of "Nikola Tesla" Airport will travel along the streets of Bulevar Heroja from Košar, Tošin bunar, the exit ramp to Motorway M11 (direction to Šid), Motorway M11 and continue on the regular route, while in the direction of the city it will travel on the regular route. The following public transport lines will continue to operate on the modified routes: Line no. 74, 75 and 72N in the direction of the "Bežanijska kosa" turnpike will travel along Par streets Tizan Aviation, Peđa Milosavljević, Dr. Hugo Klajna will continue on regular routes, while in the opposite direction they will operate on their regular routes; Line no. 76 in the direction of KBC "Bežanijska kosa" will run on the streets of Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajn, Rajkov and further in accordance with the works in Dr. Žorža Matea Street, while in the opposite direction it will travel in accordance with the works in Dr. Žorža Matea Street (on the regular route after the completion of these works); Line no. 708 will travel in the direction of Zemun polje on the streets of Partizanska avijacija, Peđa Milosavljević, Dr. Hugo Klajn, Marko Čelebonović and continue on the regular route, while in the opposite direction it will travel on its regular route. Vehicles will use the existing and temporarily established stops on the changed sections of the route: "Nikole Dobrovića 2" – (#4167) for lines no. 65, 70, 72, 74, 75, 76, 82 612, 613, 708 and 72N in Partizanske avijacije street, at a position about 100.0 meters in front of the intersection zone with Marko Čelebonovića street (seen in the direction of Gandijeva street); "Peđe Milosavljevića 1" - (#3977) for lines no. 70, 72, 74, 75, 613 and 72N in Peđe Milosavljevića Street, in a position immediately in front of the intersection zone with Dr Hugo Klajna Street, while vehicles from lines no. 65, 76, 82, 612 and 708 use the regular stop "Peđe Milosavljevica" - (#225) in Dr Hugo Klajna Street in the direction of Marko Čelebonovića Street. Work zone Select line 65 [Zvezdara 2 - Novo Bežanijsko Groblje] 70 [Bežanijska kosa - IKEA] 72 [Zeleni Venac - Nikola Tesla Airport] 72N [Trg republike - Nikola Tesla Airport] 74 [Bežanijska Kosa - Mirijevo 3] 75 [Zeleni Venac - Bežanijska Kosa] 76 [Novi Belgrade /Block 70A/ - Bežanijska Kosa/Hospital/] 82 [Zemun /Kej Oslobođenja/ - Block 44] 607 [Banovo Brdo - Nikola Tesla Airport] 612 [Novi Belgrade /Block 20/ - Nova Galenika] 613 [Novi Belgrade /Pavilions/ - Radiofar] 708 [New Belgrade /Block 70A/ - Zemun Polje]
Beograd
Source
Today
transport
08:12
Information about the temporary cancellation of the stop "Glavna pošta" in Takovska Street, direction Nemanjina Street
Information on the temporary cancellation of the stop "Glavna pošta" in Takovska Street, direction Nemanjina Street 23 28 40 41A 304N 04/08/2026 - 05/25/2026 The works have been extended until 5/25/2026. year. During the performance of regular maintenance works in Takovska Street, on the stretch from Kosovska Street to George Washington Street, in the period from 04/08 to 04/30/2026. year, there will be a temporary cancellation of the public transport stop "Glavna pošta" (direction to Nemanjina street) for lines no. 23, 40 and 304n.
Beograd
Source
Today
transport
15:25
Palilula
Information about the change in the mode of operation of public transport lines during the execution of works in Vojvode Micka Krstić Street
Information on the change of operation mode of public transport lines during the performance of works in Vojvode Micka Krstića Street 16 23 25 32N 26/05/2026 - 05/07/2026 During the performance of regular maintenance works in Vojvode Micka Krstića Street (Palilula), in the section from the intersection zone with Višnjička Street to the intersection zone with Patrisa Lumumba Street. The works will be carried out in the period from 26.5. until 5.7.2026. there will be changes in the operation of public transport lines. The works involve the complete closure of Vojvoda Micka Krstić Street in the part of the intersection zone with ul. Višnjička to the area of the intersection with ul. Patrice Lumumba. During the works, vehicles from public transport lines will operate as follows: Vehicles from line no. 16, 23, 25 and 32N will travel in the direction of the "Karaburma 2" roundabout on the streets Višnjička, Mirijevski boulevard, Sa lavador Allende still on regular routes; in the direction of the city along the streets of Marijana Gregoran, Dragoslav Srejovića, (Mija Kovačevića for lines 25 and 32N), Mija Kovačevića, Bulevar despota Stefana for lines no. 16 and 23 still regularly. Vehicles will use the existing and temporary stops on the changed sections of the route: "Salvadora Allendea 1", in Salvador Allendea Street (in the direction of the "Karaburma 2" roundabout), 50.0 meters after the intersection with Marijana Gregoran Street and "Marijane Gregoran 1" in Marijana Gregoran Street (in the direction of the city), at a position about 50.0 meters after the marked pedestrian crossing in the zone intersection of Vojvoda Mick Krstić and Marijana Gregoran streets, in front of the building with house number 36. Work zone Choose line 16 [Karaburma 2 - Novi Beograd /Pavilioni/] 23 [Karaburma 2 - Vidikovac] 25 [Karabu rma 2 - Kumodraž 2] 32N [Trg Republike - Višnjica]
Beograd
Source